What are the precautions after the installation of good machine cooling tower reducer (cooling tower reducer installation and maintenance)
Classification:
What are the things to do after the installation of Liangqi cooling tower reducer? Things to do after installation of Liangqi cooling tower reducer
1. In use or open box view and replacement parts after the reducer shall not have leakage scenes.
2. Should often check the firmware has no loose, oil level bump, oil temperature Wen bearing temperature, gears, bearings should be no abnormal vibration and noise.
3. Should adhere to the reducer appearance cleaning, breathable plug shall not be blocked, in order to heat dissipation.
4. Accessories should be contacted with the manufacturer, replacement parts after running together and loading experiments and then officially used.
Test the cooling tower around whether there is a different state; view the cooling tower power connection is stable (whether the phase voltage to meet the chiller voltage requirements);
Check whether all the valves to be opened in the waterway are open;
Check whether the pump, fan is turning;
Check whether the circulating water tank of the closed cooling tower is filled with water, and whether the water replenishment interface of the spray collection tank is connected.
Reducer should often check the oil level oil level, advocate the use of 22 to 28 hyperbolic gear oil or 90 to 120 industrial gear oil. In the summer, in the first operation using large viscosity oil for about 500 hours, the oil is emptied and new oil replacement. It is necessary to check the fan, motor and reducer in accordance with the corresponding product clarification before operation. Especially the wiring of the motor should be connected according to the wiring diagram supplied by the motor factory. Sometimes the two sides show inconsistency, simply lead to misconnection. The starting sequence from low speed to high speed. In the use of the process, there are also several points to note: cooling tower into the water must be clean and clean, beware of residual iron slag, dust and dirt, debris, to avoid jamming the water distributor blocking the pipe or blocking the nozzle, the damaged water pipe, nozzle should be replaced, affecting the role of water distribution and flushing shower equipment, such as the above conditions should be promptly eradicated.
Related News
What are the benefits of regular cleaning of cooling tower packing, the reasons for regular cleaning of cooling tower packing, how much do you know?
MORE +Cooling tower packing cleaning which is better? Guangdong Telling air conditioning is engaged in cooling tower cleaning, cooling tower chemical cleaning...
MORE +What is the role of Maliliang machine cooling tower accessories in the cooling tower renovation
The heat exchange capacity of the cooling tower is mainly determined by the gas-to-water ratio, and the traditional technology is not efficient and effective enough. If the cooling tower parts with Marley good machine for its transformation, then the shaft power of the water turbine and motor power can be achieved the same. The structure, shape, specifications and cooling principle of the cooling tower do not need to be changed.
MORE +What are the things to do after the installation of Liangqi cooling tower reducer? Things to do after installation of Liangqi cooling tower reducer
MORE +Jiangmen Wanyang Cooling Equipment Co., Ltd

TEL:18933186699

TEL:hy9698@126.com

ADD:No. 8, Longwan Road, Zhishan Town, Heshan City