Cooling tower in the water system in the central air conditioning system is a relatively common refrigeration cooling equipment, central air conditioning using cooling towers more common brands are: Marley, Spindle, Ebara, Yimegao, BAC, good machine, Golden Day, etc.!
Cooling towers are mainly open and closed cooling tower, open and closed cooling tower is the main difference between the open cooling tower circulating water can not be pressurized, closed cooling tower circulating water can be pressurized.
We share a cooling tower installation and construction method for your technical reference.
Installation of cooling towers
1, choose the appropriate installation site.
(1), the shortest distance between the inlet end of the cooling tower and the adjacent building is not less than 1.5 times the height of the tower.
(2), should not be installed in the substation, boilers and other places with heat sources, the tower should be away from open fire.
2, set more than one cooling tower spacing
(1) and buildings or side obstacles between the distance
(2) countercurrent tower: spacing should be greater than the tower engaged.
(3) cross-flow tower: spacing should be greater than one-half of the height of the tower.
(4) set two or more than two when the distance between the tower.
(5) round countercurrent tower spacing should be greater than the radius of the tower.
(6) square countercurrent tower spacing should be greater than one-half of the length of the tower.
(7) straight AC or two sides into the air square countercurrent tower spacing should be greater than the height of the tower.
3, cooling tower foundation
(1) foundation seat (platform) should be a sentence load distribution of the maximum to design the bearing strength.
(2) to the foot seat distribution configuration chart to build the foundation seat, the foundation seat is divided into single and joint seat, the minimum height of the air conditioning tower foundation is 30cm, the platform must then the same level.
(3) cooling tower foundation need to be pre-buried according to the prescribed size of the level of the steel plate, each foundation surface mark should be on the same level, elevation error of ± 1mm, the center of the angle error of ± 2mm.
(4) tower body should be placed to maintain the level, the conditions can be installed as a whole foundation.
(5) cooling tower feet seat and foundation seat should be installed in the middle of the shock absorber, can reduce the vibration of the cooling tower.
4, the cooling tower basic piping
(1) piping diameter shall not be less than the diameter of the cooling tower out of the water pipe.
(2) cooling tower water pump and heat exchanger inlet and outlet are best configured with control valves.
(3) by the pump to the direction of the water inlet needs to be installed filter.
(4) pipe diameter greater than 100mm, the cooling tower and the water pump inlet and outlet pipes need to be installed vibration-proof joints or vibration-proof hose.
Related News
What are the benefits of regular cleaning of cooling tower packing, the reasons for regular cleaning of cooling tower packing, how much do you know?
MORE +Cooling tower packing cleaning which is better? Guangdong Telling air conditioning is engaged in cooling tower cleaning, cooling tower chemical cleaning...
MORE +What is the role of Maliliang machine cooling tower accessories in the cooling tower renovation
The heat exchange capacity of the cooling tower is mainly determined by the gas-to-water ratio, and the traditional technology is not efficient and effective enough. If the cooling tower parts with Marley good machine for its transformation, then the shaft power of the water turbine and motor power can be achieved the same. The structure, shape, specifications and cooling principle of the cooling tower do not need to be changed.
MORE +What are the things to do after the installation of Liangqi cooling tower reducer? Things to do after installation of Liangqi cooling tower reducer
MORE +Jiangmen Wanyang Cooling Equipment Co., Ltd

TEL:18933186699

TEL:hy9698@126.com

ADD:No. 8, Longwan Road, Zhishan Town, Heshan City