Guangdong cooling tower custom manufacturers to tell you how the cooling tower should be laid out efficiency is better.
1. The cyclone should be smooth, cold and wet gas reflux influence is small, should be arranged in the building minimum frequency wind direction of the upwind side.
2. Cooling tower can not be arranged in the heat of the original. Exhaust gas and fumes around the exhaust port, should not be laid out in the middle of a tall building narrow area.
3. Cooling towers should be arranged separately. When more than one arrangement is required, HVAC design Mr. Du suggested that the distance between the inverted flow tower should comply with the following provisions.
①. Long axis is located in the same straight line of adjacent tower row, the distance is not less than 4m.
②. The long axis is not in the same straight line, the spacing between the tower rows arranged parallel to each other is not less than 4 times the tower inlet, the length of each row and the total width ratio should not exceed 5:1.
4. One side into the wind tower air supply surface should face the dominant wind direction in summer, both sides into the wind tower air supply surface should be parallel to the dominant wind direction in summer.
5. Cooling tower air supply side and the distance between the building should be more than two times the tower air inlet; In addition to ventilation requirements and pipeline construction location, cooling tower around the maintenance channel should also be left, channel spacing of not less than 1.0m.
6. Cooling tower and adjacent buildings facing the cooling tower is the distance between the windows should not be less than 3.0m, not only to meet the cooling tower ventilation requirements, but also pay attention to the noise. Water seepage and other effects on the building.
7. Intermittent operation of the open cooling system, cooling tower chassis or collection tank of high efficiency water collection volume should exceed the wet cooling tower packing and other parts of the water consumption and stop the pump when the gravity inflow of the pipe water capacity and.
8. Cooling water collection tank should be set up as close as possible to the ling tower.
9. Cooling tower should be set in a special premise, shall not be set directly on the floor or roof.
10. Cooling tower installation environment for noise control requirements are high, the following countermeasures can be taken.
①. Cooling tower location to avoid noise sensitive areas;
②. Selection of low-noise or ultra-low noise cooling tower;
③. Water inlet. Water outlet. Vibration damping and noise prevention equipment is set on the water supply pipe;
④. Cooling tower with wind shield, the cooling tower will be directed to avoid the direction of the building;
⑤. The building is equipped with sound-absorbing barriers;
⑥. Cooling tower is basically set up vibration isolation device.
Related News
What are the benefits of regular cleaning of cooling tower packing, the reasons for regular cleaning of cooling tower packing, how much do you know?
MORE +Cooling tower packing cleaning which is better? Guangdong Telling air conditioning is engaged in cooling tower cleaning, cooling tower chemical cleaning...
MORE +What is the role of Maliliang machine cooling tower accessories in the cooling tower renovation
The heat exchange capacity of the cooling tower is mainly determined by the gas-to-water ratio, and the traditional technology is not efficient and effective enough. If the cooling tower parts with Marley good machine for its transformation, then the shaft power of the water turbine and motor power can be achieved the same. The structure, shape, specifications and cooling principle of the cooling tower do not need to be changed.
MORE +What are the things to do after the installation of Liangqi cooling tower reducer? Things to do after installation of Liangqi cooling tower reducer
MORE +Jiangmen Wanyang Cooling Equipment Co., Ltd

TEL:18933186699

TEL:hy9698@126.com

ADD:No. 8, Longwan Road, Zhishan Town, Heshan City